SWPPP Compliance / Erosion Control

RECON works with manufactured and natural materials to provide effective soil stabilization, which can be the foundation for a healthy restoration site.

Project Example: La Pata

Focus: Habitat mitigation

Location: Orange County, CA

Habitat Type: Riparian habitat

Implementation: Erosion control devices, container plant/pole-cutting installation, and irrigation

Maintenance: Five-year maintenance and monitoring

The La Pata Avenue Mitigation Project restored two acres of riparian vegetation in Orange County, California. Due to severe erosion in the project area, creation of a new stream channel was required. The project included grading/recontouring, stabilization of the stream banks through installation of natural erosion control devices (i.e., coconut blankets and vertical mulch), container plant/pole-cutting installation, supplemental irrigation, and ongoing weed maintenance.

Before: Erosion scouring

20170418_102340.jpg

After: Coconut blankets, pole-cuttings, and vertical mulch were installed for stabilization

20180502_074029.jpg

Coconut blankets and container plants were installed in the site.

20191206_075826.jpg
20191206_075945.jpg